31 AV CT E over CLEAR CREEK

0.1 S JCT SR 410 · County 053, Washington · Built 1971 · 2 Lanes · 430 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
081191000000000
Year Built
1971
Length
13.1 m (43 ft)
Max Span
12.2 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
430
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$806,000
Total Project Cost
$1,611,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.