HARMONY DR over COAL CREEK

0.35 NW COAL CRK RD (0.54 · County 015, Washington · Built 1953 · 2 Lanes · 2,253 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
081066000000000
Year Built
1953
Length
17.4 m (57.1 ft)
Max Span
7.6 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
2,253
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,210,000
Total Project Cost
$2,419,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.