CAMPBELL ROAD over UNION PACIFIC RAILROAD

03.0 E FREEMAN · County 063, Washington · Built 1927 · 2 Lanes · 20 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
080863000000000
Year Built
1927
Reconstructed
1993
Length
30.2 m (99.1 ft)
Max Span
9.8 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
20
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$446,000
Total Project Cost
$893,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.