MILL CREEK RD over MILL CREEK

1.66 N SR 4 (MP 47.64) · County 015, Washington · Built 1960 · 2 Lanes · 145 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
080785000000000
Year Built
1960
Length
17.7 m (58.1 ft)
Max Span
7.6 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
145
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,228,000
Total Project Cost
$2,455,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.