PEONE ROAD over DEADMAN CREEK

0.40 MI S HWY 206 · County 063, Washington · Built 1949 · 2 Lanes · 567 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
080348000000000
Year Built
1949
Length
7.3 m (24 ft)
Max Span
3.4 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
567
Material
Steel
Design
Girder and Floorbeam System
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$614,000
Total Project Cost
$1,227,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.