MCDONALD RD. over MUD LAKE DRAIN
01.00 E BROWNSTOWN · County 077, Washington · Built 1959 · 2 Lanes · 123 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
46.389975, -120.586028
This bridge is in worse condition than 13.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 67 years old.
Nearby Bridges
MCDONALD RD. over WIP Canal
Built 2006
HARRAH DRAIN RD. over USIS CANAL
Built 1978
Fort Road over Mud Lake Drain Canal
Built 2019
BRANCH RD. over CANAL - MAIN
Built 1962
BRANCH RD. over DRAIN
Built 1968
FORT RD. over USIS CANAL
Built 2001
Fort Road over Toppenish Creek
Built 2008
PROGRESSIVE RD. over USIS CANAL
Built 1972
HARRAH RD. over CANAL
Built 1950
HARRAH ROAD over USIS CANAL
Built 1976
Bridge Details
- Structure #
- 080344000000000
- Year Built
- 1959
- Length
- 7.3 m (24 ft)
- Max Span
- 7 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 123
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $614,000
- Total Project Cost
- $1,227,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.