EAST TANEUM ROAD over TANEUM CREEK

00.43 E I-90 · County 037, Washington · Built 1957 · 2 Lanes · 134 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
080306000000000
Year Built
1957
Length
23.8 m (78.1 ft)
Max Span
17.7 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
134
Material
Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.