S BOEING ACCESS RD over BNRR

0.3 MI W OF E MARGINAL WY · County 033, Washington · Built 1945 · 6 Lanes · 32,504 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
080025000000000
Year Built
1945
Reconstructed
2018
Length
102.7 m (336.9 ft)
Max Span
27.7 m
Width
25.1 m (82.3 ft)
Lanes
6
Daily Traffic
32,504
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$14,175,000
Total Project Cost
$28,350,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.