UPPER PRESTON RD over LAKE CREEK

1.8 MI SE OF I-90 · County 033, Washington · Built 1950 · 2 Lanes · 1,112 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 5 Fair

Location

47.503689, -121.904061

This bridge is in worse condition than 83.7% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 76 years old.

Nearby Bridges

Bridge Details

Structure #
080024000000000
Year Built
1950
Length
18.3 m (60 ft)
Max Span
6.1 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
1,112
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,264,000
Total Project Cost
$2,527,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.