PROVIDENCE RD over DRY RELIEF
00.59 MI E JOHNSON · County 001, Washington · Built 1900 · 2 Lanes · 10 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
46.911522, -118.885558
This bridge is in worse condition than 73.8% of bridges in County 001. The average bridge in Washington is 0 years old; this one is 126 years old.
Nearby Bridges
LIND-WARDEN RD over LIND COULEE
Built 1954
DEAL RD over DRY WASH
Built 2004
CALLOWAY RD over DRY WASH
Built 1962
CALLOWAY RD over EAST LOW CANAL
Built 2006
W RD SE over EAST LOW CANAL
Built 2005
8 ROAD SE over LIND COULEE WASTEWAY
Built 1988
CUNNINGHAM RD over PROVIDENCE COULEE
Built 1920
8 ROAD SE over EAST LOW CANAL BLK 44
Built 1985
U ROAD SE over S. WARDEN COULEE
Built 1960
BOOKER RD over EAST LOW CANAL
Built 1971
Bridge Details
- Structure #
- 079936000000000
- Year Built
- 1900
- Reconstructed
- 1976
- Length
- 7 m (23 ft)
- Max Span
- 6.5 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 10
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $596,000
- Total Project Cost
- $1,191,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.