N RD SW over IRRIGATION LATERAL
N SW 0.3 S of 12 SW · County 025, Washington · Built 1958 · 2 Lanes · 74 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
46.912044, -119.792478
This bridge is in worse condition than 65.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 68 years old.
Nearby Bridges
N RD SW over IRRIGATION LATERAL
Built 1958
L ROAD SW over LAT. RB5 BLK 82
Built 1990
M RD SW over WEST CANAL
Built 1958
O RD SW over WEST CANAL
Built 1958
L ROAD SW over LAT. RB4 BLK 82
Built 1990
K RD SW over IRRIGATION LATERAL
Built 1958
12 ROAD SW over ROYAL BRANCH CANAL BLK 8
Built 1956
L ROAD SW over LAT. W61C BLK 81
Built 1964
11 ROAD SW over ROYAL BRANCH CANAL BLK82
Built 1987
J RD SW over IRRIGATION LATERAL
Built 1964
Bridge Details
- Structure #
- 079831000000000
- Year Built
- 1958
- Length
- 13.1 m (43 ft)
- Max Span
- 6.7 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 74
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $956,000
- Total Project Cost
- $1,913,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.