BEND ROAD over POTHOLES EAST CANAL
0.57N JCT 200 · County 021, Washington · Built 1956 · 2 Lanes · 40 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
46.729447, -119.005422
This bridge is in worse condition than 56.4% of bridges in County 021. The average bridge in Washington is 0 years old; this one is 70 years old.
Nearby Bridges
COYAN RD. over POTHOLES EAST CANAL
Built 1957
MUSE DRIVE over POTHOLES EAST CANAL
Built 2023
COUNTY ROAD over SCOOTENEY WASTEWAY
Built 1956
KRUG ROAD over E L 85 M 5
Built 1996
YEISLEY RD over BRANCH CANAL - EL 85
Built 2005
COYAN RD. over POTHOLES CANAL
Built 2021
PARADISE ROAD over EAST LATERAL 85
Built 1957
MAINTENANCE ROAD over SCOOTENEY WASTEWAY
Built 1953
HATTON RD over EAST LOW CANAL
Built 1953
GEARHARDT RD over LATERAL EL85 STA 2+30.30
Built 1952
Bridge Details
- Structure #
- 079667000000000
- Year Built
- 1956
- Length
- 26.8 m (87.9 ft)
- Max Span
- 9.1 m
- Width
- 7.6 m (24.9 ft)
- Lanes
- 2
- Daily Traffic
- 40
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,769,000
- Total Project Cost
- $3,538,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.