RD. NO. 20 over S FORK SAUK RIVER

MP 31.2 RD. NO. 20 · County 061, Washington · Built 1978 · 2 Lanes · 140 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
060502000001465
Year Built
1978
Length
30.5 m (100.1 ft)
Max Span
29.6 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
140
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.