FSDR 43 over LAYOUT CREEK

20 MINUTES WEST OF WIND R · County 059, Washington · Built 2014 · 1 Lanes · 30 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
060303000015941
Year Built
2014
Length
13.7 m (44.9 ft)
Max Span
13 m
Width
5 m (16.4 ft)
Lanes
1
Daily Traffic
30
Material
Prestressed Concrete
Design
Slab
Owner
U.S. Forest Service
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.