NE 60TH STREET over SOUND TRANSIT

4.3 E JCT I-405 · County 033, Washington · Built 2024 · 2 Lanes · 4,435 vehicles/day

Overall
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Superstructure 8 Very Good
Substructure 8 Very Good

This bridge is in worse condition than 5% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 2 years old.

Bridge Details

Structure #
002005680000000
Year Built
2024
Length
10.3 m (33.8 ft)
Max Span
10.3 m
Width
22.5 m (73.8 ft)
Lanes
2
Daily Traffic
4,435
Material
Concrete
Design
Slab
Owner
Railroad
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.