28TH TO 24TH AVE S over TERRAIN (FUTURE SR 509)

0.3 MI W OF SR-99 · County 033, Washington · Built 2017 · 4 Lanes · 4,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
002005160000000
Year Built
2017
Length
39.3 m (128.9 ft)
Max Span
37.5 m
Width
26.5 m (86.9 ft)
Lanes
4
Daily Traffic
4,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,094,000
Total Project Cost
$8,187,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.