NW LA CENTER RD over I-5
2.6 N JCT SR 501 · County 011, Washington · Built 2017 · 3 Lanes · 3,700 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
45.851722, -122.703222
This bridge is in worse condition than 6.8% of bridges in County 011. The average bridge in Washington is 0 years old; this one is 9 years old.
Nearby Bridges
I-5 over E FORK LEWIS RIVER
Built 1969
I-5 over E FORK LEWIS RIVER
Built 1939
LA CENTER ROAD over EAST FORK LEWIS RIVER
Built 2001
PIONEER STREET over I-5
Built 2010
SR 501 over GEE CREEK
Built 1965
DIVISION ST over GEE CREEK
Built 1975
HERON DRIVE over GEE CREEK
Built 2003
I-5 over LEWIS RIVER
Built 1968
I-5 over LEWIS RIVER
Built 1940
S Refuge Rd over Lake River and Railroad
Built 2019
Bridge Details
- Structure #
- 002005130000000
- Year Built
- 2017
- Length
- 87.5 m (287.1 ft)
- Max Span
- 41.5 m
- Width
- 29.8 m (97.8 ft)
- Lanes
- 3
- Daily Traffic
- 3,700
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,635,000
- Total Project Cost
- $9,270,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.