SR 9 over EVERETT WATER MAIN

1.8 N JCT US 2 · County 061, Washington · Built 2009 · 6 Lanes · 21,133 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

47.977389, -122.102694

This bridge is in worse condition than 5.2% of bridges in County 061. The average bridge in Washington is 0 years old; this one is 17 years old.

Nearby Bridges

Bridge Details

Structure #
002004020000000
Year Built
2009
Length
26.5 m (86.9 ft)
Max Span
25.3 m
Width
28.4 m (93.2 ft)
Lanes
6
Daily Traffic
21,133
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,601,000
Total Project Cost
$3,202,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.