SR 101 over LELAND CREEK

7.6 S JCT SR 104 · County 031, Washington · Built 2023 · 2 Lanes · 2,792 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0019882C0000000
Year Built
2023
Length
42.7 m (140.1 ft)
Max Span
42.7 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
2,792
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,130,000
Total Project Cost
$2,261,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.