US 101 over DISCOVERY CREEK

20.8 E JCT SR 117 · County 009, Washington · Built 2024 · 3 Lanes · 19,244 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

48.046836, -123.035253

This bridge is in worse condition than 6.5% of bridges in County 009. The average bridge in Washington is 0 years old; this one is 2 years old.

Nearby Bridges

Bridge Details

Structure #
0019694B0000000
Year Built
2024
Length
37.7 m (123.7 ft)
Max Span
36.9 m
Width
16.5 m (54.1 ft)
Lanes
3
Daily Traffic
19,244
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,556,000
Total Project Cost
$3,112,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.