SR 302 over MINTER CREEK
6.3 E MASON CO · County 053, Washington · Built 2020 · 2 Lanes · 16,302 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
47.380556, -122.7005
This bridge is in worse condition than 7.1% of bridges in County 053. The average bridge in Washington is 0 years old; this one is 6 years old.
Nearby Bridges
SR 302 over LITTLE MINTER CREEK
Built 2021
CREVISTON DR NW over MINTER CREEK
Built 1954
118 AV NW over MINTER CREEK
Built 1997
118 AV NW over MINTER CREEK
Built 2005
160TH ST NW over HUGE CREEK
Built 2021
HUNTER ROAD SW over HUGE CREEK
Built 2012
CRAMER RD NW over LOCKEY CREEK
Built 1954
WRIGHT BLISS RD NW over EAST FORK ROCKY CREEK
Built 1999
SR 302 over HENDERSON BAY
Built 1936
SR 302 SPUR over PURDY CREEK
Built 2023
Bridge Details
- Structure #
- 0019446A0000000
- Year Built
- 2020
- Length
- 48.2 m (158.1 ft)
- Max Span
- 48.2 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 16,302
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,201,000
- Total Project Cost
- $2,402,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.