SR 162 over SPIKETON CREEK

17.2 E JCT SR 410 · County 053, Washington · Built 2019 · 2 Lanes · 7,121 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0019438T0000000
Year Built
2019
Length
73.2 m (240.2 ft)
Max Span
73.2 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
7,121
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,512,000
Total Project Cost
$9,025,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.