SR 902 over I-90

12.3 E JCT I-90 · County 063, Washington · Built 2020 · 2 Lanes · 6,040 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

47.592097, -117.565556

This bridge is in worse condition than 5.2% of bridges in County 063. The average bridge in Washington is 0 years old; this one is 6 years old.

Nearby Bridges

Bridge Details

Structure #
0019425A0000000
Year Built
2020
Length
68.4 m (224.4 ft)
Max Span
32.9 m
Width
14.7 m (48.2 ft)
Lanes
2
Daily Traffic
6,040
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,758,000
Total Project Cost
$3,516,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.