SR 129 over RATTLESNAKE CREEK
5.8 N OREGON · County 003, Washington · Built 2015 · 2 Lanes · 318 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
46.057172, -117.237861
This bridge is in worse condition than 7.1% of bridges in County 003. The average bridge in Washington is 0 years old; this one is 11 years old.
Bridge Details
- Structure #
- 0018763A0000000
- Year Built
- 2015
- Length
- 7.6 m (24.9 ft)
- Max Span
- 7.6 m
- Width
- 17.1 m (56.1 ft)
- Lanes
- 2
- Daily Traffic
- 318
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $632,000
- Total Project Cost
- $1,264,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.