MCKINLEY WAY over I-5

0.2 N JCT I-705 · County 053, Washington · Built 2018 · 2 Lanes · 9,053 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0018607B0000000
Year Built
2018
Length
101.2 m (332 ft)
Max Span
44.2 m
Width
22.3 m (73.2 ft)
Lanes
2
Daily Traffic
9,053
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,520,000
Total Project Cost
$11,039,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.