SR 6 over WILLAPA RIVER

7.0 E JCT US 101 · County 049, Washington · Built 2014 · 2 Lanes · 2,737 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0018464A0000000
Year Built
2014
Length
83.8 m (274.9 ft)
Max Span
38.1 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
2,737
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,482,000
Total Project Cost
$4,964,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.