I-90 over AVALANCHE RELIEF

3.3 E JCT SR 906 · County 037, Washington · Built 2016 · 4 Lanes · 18,069 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

47.357081, -121.367425

This bridge is in worse condition than 18.5% of bridges in County 037. The average bridge in Washington is 0 years old; this one is 10 years old.

Nearby Bridges

Bridge Details

Structure #
0018127A0000000
Year Built
2016
Length
367.6 m (1206 ft)
Max Span
51.8 m
Width
18 m (59.1 ft)
Lanes
4
Daily Traffic
18,069
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$16,612,000
Total Project Cost
$33,225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.