SR 529 over EBEY SLOUGH
0.2 N JCT I-5 · County 061, Washington · Built 2012 · 4 Lanes · 16,475 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
48.045222, -122.17925
This bridge is in worse condition than 5.2% of bridges in County 061. The average bridge in Washington is 0 years old; this one is 14 years old.
Nearby Bridges
I-5 over EBEY SL / SR 529 / RR
Built 1954
I-5 over SR529 RR EBEY SL 60TH PL
Built 1969
I-5 over SR 529 NB RAMP
Built 1968
I-5 over SR 529 NB RAMP
Built 1968
I-5 over SR 528 4TH ST
Built 1971
I-5 over SR 528 4TH ST
Built 1952
I-5 over STEAMBOAT SLOUGH
Built 1968
I-5 over STEAMBOAT SLOUGH
Built 1968
SR 529 over STEAMBOAT SLOUGH
Built 1927
SR 529 over STEAMBOAT SLOUGH
Built 1954
Bridge Details
- Structure #
- 0017948A0000000
- Year Built
- 2012
- Length
- 207.3 m (680.1 ft)
- Max Span
- 71.6 m
- Width
- 21.9 m (71.9 ft)
- Lanes
- 4
- Daily Traffic
- 16,475
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $9,690,000
- Total Project Cost
- $19,380,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.