SR 522 E-E RAMP over BNSF RR

JCT US 2 · County 061, Washington · Built 2011 · 1 Lanes · 7,378 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0017938A0000000
Year Built
2011
Length
214.9 m (705.1 ft)
Max Span
68.6 m
Width
9.1 m (29.9 ft)
Lanes
1
Daily Traffic
7,378
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,856,000
Total Project Cost
$9,711,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.