I-90 over GOLD CREEK

0.7 E JCT SR 906 · County 037, Washington · Built 2011 · 3 Lanes · 18,069 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 8 Very Good

Location

47.391439, -121.385447

This bridge is in worse condition than 44.4% of bridges in County 037. The average bridge in Washington is 0 years old; this one is 15 years old.

Nearby Bridges

Bridge Details

Structure #
0017852C0000000
Year Built
2011
Length
330.7 m (1085 ft)
Max Span
47.2 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
18,069
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$14,946,000
Total Project Cost
$29,892,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.