US 12 over TIETON RIVER

26.0 E LEWIS CO · County 077, Washington · Built 2010 · 2 Lanes · 2,324 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0017743B0000000
Year Built
2010
Length
75.3 m (247 ft)
Max Span
48.6 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
2,324
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,994,000
Total Project Cost
$3,989,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.