US 395 over US 2

9.2 N JCT I-90 · County 063, Washington · Built 2011 · 2 Lanes · 3,602 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0017610A0000000
Year Built
2011
Length
73.2 m (240.2 ft)
Max Span
35 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
3,602
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,280,000
Total Project Cost
$4,560,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.