US 2 over US 97

JCT US 97 · County 007, Washington · Built 2008 · 2 Lanes · 12,372 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0017418B0000000
Year Built
2008
Length
52.7 m (172.9 ft)
Max Span
51.2 m
Width
14.9 m (48.9 ft)
Lanes
2
Daily Traffic
12,372
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,972,000
Total Project Cost
$3,944,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.