NB I-5 over NE 117TH SALMON CK PATH

4.1 N JCT SR 500 · County 011, Washington · Built 2005 · 4 Lanes · 40,791 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0016610A0000000
Year Built
2005
Length
130.1 m (426.8 ft)
Max Span
47.2 m
Width
21.6 m (70.9 ft)
Lanes
4
Daily Traffic
40,791
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,099,000
Total Project Cost
$14,198,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.