I-5 HOV LANES over SR 524 SPUR/44TH AVE W

3.0 N JCT SR 104 · County 061, Washington · Built 2004 · 2 Lanes · 1,027 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0016469B0000000
Year Built
2004
Length
82 m (269 ft)
Max Span
34.4 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
1,027
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,066,000
Total Project Cost
$6,133,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.