SR 11 over CLIFF

11.9 N JCT I-5 · County 057, Washington · Built 1999 · 2 Lanes · 2,472 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0015597B0000000
Year Built
1999
Length
42.1 m (138.1 ft)
Max Span
14.9 m
Width
3.5 m (11.5 ft)
Lanes
2
Daily Traffic
2,472
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$721,000
Total Project Cost
$1,442,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.