SR 542 (SUNSET DR) over I-5

JCT I-5 · County 073, Washington · Built 1996 · 6 Lanes · 31,813 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0014656A0000000
Year Built
1996
Length
62.5 m (205.1 ft)
Max Span
31.7 m
Width
25.8 m (84.6 ft)
Lanes
6
Daily Traffic
31,813
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,846,000
Total Project Cost
$7,693,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.