SR 18 RAMP over HOLDER CR & HOBART RD

4.6 E JCT SR 169 · County 033, Washington · Built 1996 · 1 Lanes · 935 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0014567G0000000
Year Built
1996
Length
104.9 m (344.2 ft)
Max Span
31.7 m
Width
8.2 m (26.9 ft)
Lanes
1
Daily Traffic
935
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,206,000
Total Project Cost
$4,412,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.