SR 509 over RIVER RR PORTLAND AVE
0.7 N JCT I-705 · County 053, Washington · Built 1996 · 4 Lanes · 14,925 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.245986, -122.408075
This bridge is in worse condition than 17.5% of bridges in County 053. The average bridge in Washington is 0 years old; this one is 30 years old.
Nearby Bridges
STATE ROUTE 509 over PUYALLUP WATERWAY RR
Built 1911
SR 509 RAMP over RAILROAD & EAST RIVER ST
Built 1996
PUYALLUP AVE over E 24TH&B ST& ABANDONED R
Built 1910
SR 509 RAMP over RAILROAD
Built 1996
Fish War Mem X-ing over PUYALLUP RIVER
Built 1925
FISHING WARS XING over RAMP RR ROAD TERRAIN
Built 2019
PORTLAND AVE over PUYALLUP AVE NPRR
Built 1973
Fish War Mem X-ing over RAILROAD
Built 1925
Fish War Mem X-ing over TERRAIN
Built 1925
Fish War Mem X-ing over RAMP
Built 1925
Bridge Details
- Structure #
- 0014409B0000000
- Year Built
- 1996
- Length
- 1092.4 m (3584 ft)
- Max Span
- 135.6 m
- Width
- 23.1 m (75.8 ft)
- Lanes
- 4
- Daily Traffic
- 14,925
- Material
- Prestressed Concrete Continuous
- Design
- Segmental Box Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $74,906,000
- Total Project Cost
- $149,811,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.