US 97 over SATUS CREEK
16.0 N KLICKITAT CO · County 077, Washington · Built 1994 · 2 Lanes · 4,013 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.235386, -120.418936
This bridge is in worse condition than 58.9% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 32 years old.
Nearby Bridges
US 97 over DRY CREEK
Built 1990
US 97 over SATUS CREEK
Built 2012
OLD GOLDENDALE RD. over TOPPENISH CREEK
Built 1948
REFUGE ROAD over TOPPENISH CREEK
Built 1998
WAPATO ROAD SOUTH over MARION DRAIN
Built 1974
CAMPBELL RD. over TOPPENISH CREEK
Built 1960
CAMPBELL RD. over MARION DRAIN
Built 1974
OLD GOLDENDALE RD over MARION DRAIN
Built 1974
US 97 over TOPPENISH CREEK
Built 2002
ASHUE RD. over MARION DRAIN
Built 1990
Bridge Details
- Structure #
- 0014359A0000000
- Year Built
- 1994
- Length
- 41.1 m (134.8 ft)
- Max Span
- 39.6 m
- Width
- 11.9 m (39 ft)
- Lanes
- 2
- Daily Traffic
- 4,013
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,218,000
- Total Project Cost
- $2,437,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.