SOUTHCENTER BLVD over GREEN RIVER
0.12 MI E INTRURBAN AVE S · County 033, Washington · Built 1994 · 5 Lanes · 10,616 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
47.463711, -122.248786
This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 32 years old.
Nearby Bridges
I-405 over GREEN RIVER
Built 1964
I-405 RAMP over SOUTHCENTER BLVD
Built 1994
I-405 RAMP over SOUTHCENTER BLVD
Built 1994
66TH AVE S over I-405
Built 1990
RAMP ACCESS ROAD over GREEN RIVER
Built 1994
INTERURBAN AVE S over GREEN RIVER
Built 1963
I-405 over SR 181
Built 1964
I-405 over RR & CITY STREETS
Built 1965
GRADY WAY over UPRR & BNRR
Built 1986
61ST AVE S over I-405
Built 1962
Bridge Details
- Structure #
- 0014269D0000000
- Year Built
- 1994
- Length
- 74.7 m (245.1 ft)
- Max Span
- 35.1 m
- Width
- 21.9 m (71.9 ft)
- Lanes
- 5
- Daily Traffic
- 10,616
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,724,000
- Total Project Cost
- $7,448,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.