SOUTHCENTER BLVD over GREEN RIVER

0.12 MI E INTRURBAN AVE S · County 033, Washington · Built 1994 · 5 Lanes · 10,616 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

47.463711, -122.248786

This bridge is in worse condition than 48.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 32 years old.

Nearby Bridges

Bridge Details

Structure #
0014269D0000000
Year Built
1994
Length
74.7 m (245.1 ft)
Max Span
35.1 m
Width
21.9 m (71.9 ft)
Lanes
5
Daily Traffic
10,616
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$3,724,000
Total Project Cost
$7,448,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.