SR 16 NB over TREMONT ST

8.3 N PIERCE CO · County 035, Washington · Built 1988 · 2 Lanes · 27,637 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

47.521497, -122.660372

This bridge is in worse condition than 25.8% of bridges in County 035. The average bridge in Washington is 0 years old; this one is 38 years old.

Nearby Bridges

Bridge Details

Structure #
0013025A0000000
Year Built
1988
Length
40.5 m (132.9 ft)
Max Span
39 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
27,637
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,264,000
Total Project Cost
$2,527,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.