SR 20 over RUBY CREEK

9.8 E JCT SR 31 · County 051, Washington · Built 1985 · 2 Lanes · 921 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0012745A0000000
Year Built
1985
Length
41.1 m (134.8 ft)
Max Span
13.7 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
921
Material
Prestressed Concrete Continuous
Design
Channel Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,026,000
Total Project Cost
$2,052,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.