SR 507 over TACOMA RAIL RR
1.8 N JCT SR 510 · County 067, Washington · Built 1982 · 2 Lanes · 15,046 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.932875, -122.572478
This bridge is in worse condition than 61.3% of bridges in County 067. The average bridge in Washington is 0 years old; this one is 44 years old.
Nearby Bridges
SR 507 over CENTRALIA POWER CANAL
Built 1954
SR 507 over NISQUALLY RIVER
Built 1987
SR 507 over YELM CREEK
Built 1986
WILKENSEN ROAD over CENTRALIA CANAL
Built 1986
NISQUALLY BR. RD. over NISQUALLY RIVER
Built 1953
WARREN STREET over MUCK CREEK
Built 2013
ELLSWORTH WDS RD over MUCK CREEK
Built 1950
33RD DIV & TANK TR over MUCK CREEK
Built 1994
SR 507 over LACAMAS CREEK
Built 2016
56 AV S over LACAMAS CREEK
Built 1972
Bridge Details
- Structure #
- 0012179A0000000
- Year Built
- 1982
- Length
- 48.5 m (159.1 ft)
- Max Span
- 18.3 m
- Width
- 11.5 m (37.7 ft)
- Lanes
- 2
- Daily Traffic
- 15,046
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,435,000
- Total Project Cost
- $2,870,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.