SR 508 over BEAR CANYON CREEK

21.4 E JCT I-5 · County 041, Washington · Built 1983 · 2 Lanes · 1,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0012148A0000000
Year Built
1983
Length
82.3 m (270 ft)
Max Span
26.7 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
1,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,180,000
Total Project Cost
$4,360,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.