SR 112 over SEKIU RIVER

9.6 E MAKAH RES · County 009, Washington · Built 1982 · 2 Lanes · 881 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0012080A0000000
Year Built
1982
Length
96.9 m (317.9 ft)
Max Span
37.2 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
881
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,870,000
Total Project Cost
$5,740,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.