I-182 over COLUMBIA RIVER
0.9 E JCT SR 240 · County 005, Washington · Built 1984 · 3 Lanes · 36,943 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
46.265775, -119.240856
This bridge is in worse condition than 58.1% of bridges in County 005. The average bridge in Washington is 0 years old; this one is 42 years old.
Nearby Bridges
I-182 over COLUMBIA R CITY STREETS
Built 1984
SR 240 W-W RAMP over I-182
Built 1984
SR 240 RAMP over I-182 RAMP
Built 1984
CNTY RD 100 over I-182
Built 1983
SR 240 over YAKIMA RIVER
Built 2005
SR 240 over YAKIMA RIVER
Built 2004
I-182 S-E RAMP over SR 240/GEO WASH WAY
Built 1983
S-E RAMP over I-182
Built 1984
SR 240/G WASH WAY over I-182
Built 1983
SR 240 over WETLAND
Built 2007
Bridge Details
- Structure #
- 0012042B0000000
- Year Built
- 1984
- Length
- 594.4 m (1950.1 ft)
- Max Span
- 137.2 m
- Width
- 19.4 m (63.6 ft)
- Lanes
- 3
- Daily Traffic
- 36,943
- Material
- Prestressed Concrete Continuous
- Design
- Segmental Box Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $25,009,000
- Total Project Cost
- $50,018,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.