SR 170 over EAST LOW CANAL
2.4 E JCT SR 17 · County 025, Washington · Built 1980 · 2 Lanes · 2,878 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.969961, -119.067631
This bridge is in worse condition than 18.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 46 years old.
Nearby Bridges
S RD SE over IRRIGATION LATERAL
Built 1952
T RD SE over EAST LOW CANAL
Built 1984
U ROAD SE over EAST LOW CANAL BLK 44
Built 1985
8 ROAD SE over EAST LOW CANAL BLK 44
Built 1985
U ROAD SE over S. WARDEN COULEE
Built 1960
11 RD SE over EAST LOW CANAL
Built 1952
W RD SE over EAST LOW CANAL
Built 2005
8 ROAD SE over LIND COULEE WASTEWAY
Built 1988
U ROAD SE over LIND COULEE
Built 1954
6 RD SE over LIND COULEE WASTEWAY
Built 1991
Bridge Details
- Structure #
- 0011702A0000000
- Year Built
- 1980
- Length
- 40.8 m (133.9 ft)
- Max Span
- 39.3 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 2,878
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,210,000
- Total Project Cost
- $2,419,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.