YAKIMA VALLEY HWY over I-82
4.0 E JCT SR 22 · County 077, Washington · Built 1978 · 2 Lanes · 2,913 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.391939, -120.240836
This bridge is in worse condition than 13.8% of bridges in County 077. The average bridge in Washington is 0 years old; this one is 48 years old.
Nearby Bridges
YAKIMA VALLEY HWY over S.V.I.D. CANAL
Built 1958
ZILLAH DR. E. over SVID CANAL
Built 1967
I-82 over WASTEWATER DRAINAGE
Built 1980
SCHOOLEY Rd. over SVID CANAL
Built 1954
I-82 over COUNTY RD/OLD US 12
Built 1978
I-82 over COUNTY RD/OLD US 12
Built 1978
YAKIMA VALLEY HWY over S.V.I.D. CANAL
Built 1958
MEYERS RD. N. over YAKIMA RIVER
Built 2017
N MEYERS RD over I-82
Built 1980
GRANGER RD. N. over SVID CANAL
Built 1974
Bridge Details
- Structure #
- 0010862A0000000
- Year Built
- 1978
- Length
- 102.4 m (336 ft)
- Max Span
- 54.3 m
- Width
- 13.1 m (43 ft)
- Lanes
- 2
- Daily Traffic
- 2,913
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,352,000
- Total Project Cost
- $6,703,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.