I-205 over SR 14 BNRR

0.2 N OREGON · County 011, Washington · Built 1982 · 8 Lanes · 160,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

45.603847, -122.551706

This bridge is in worse condition than 55.3% of bridges in County 011. The average bridge in Washington is 0 years old; this one is 44 years old.

Nearby Bridges

Bridge Details

Structure #
0010833A0000000
Year Built
1982
Length
2265.9 m (7434.1 ft)
Max Span
182.9 m
Width
45.9 m (150.6 ft)
Lanes
8
Daily Traffic
160,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$243,650,000
Total Project Cost
$487,299,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.